
E-bikingBikingWalkingRunningHikingBirdingFishingHorseback ridingCross-country skiingSnowmobilingand more
The D & H Rail Trail follows the old Delaware and Hudson line for about 39 miles from Simpson, just north of Carbondale, to the New York state line beyond Lanesboro. The southern half climbs the upper Lackawanna River past Forest City and Union Dale to the summit at Ararat. From there the grade drops through the mile long Thompson horseshoe curve, follows Starrucca Creek through Stevens Point and Brandt, and passes under the Starrucca Viaduct at Lanesboro. The last miles run beside the North Branch of the Susquehanna River. Grades are gentle the whole way. The improved sections carry smooth crushed stone; the middle stretch between Ararat and Stevens Point is graded original railbed, best on a mountain bike.
D & H Rail Trail
Your comfort. Prognosticated.
-Cory

In a typical year the D & H Rail Trail has about 106 to 152 days of excellent weather for popular activities such as hiking, dog walking, e-biking, biking, running, walking, and birding, with May, September, and October the best months.
Hourly comfort scores for the next 15 days of weather, tuned to your activity and your own thresholds.
Plan your visit to this trail. Get the best windows for a comfortable outing.
Enjoy the D & H Rail Trail!

In half of past years, color along the D & H Rail Trail peaks October 12 to 21, typically around October 16. The trail has 53% deciduous coverage, with the majority being red maple, sugar maple, American beech, and white ash.
The Erie Railroad built this line so Carbondale coal could reach Lanesboro and the Erie main line. The Jefferson Railroad was chartered in 1864 for that purpose. In 1868 the Delaware and Hudson contracted with the Erie to build north from Carbondale over Ararat Summit. The Erie financed the work and laid the track between 1869 and 1872. The line grew into the D and H Pennsylvania Division, a 93 mile route that hauled anthracite from the Lackawanna and Wyoming valleys to upstate New York, New England, and Canada. Pusher engines worked the long grade to Ararat Summit for a century. Traffic fell after Conrail sold the D and H a more direct route to Scranton in 1980. The Carbondale to Brandt section was abandoned in 1982, and the rest of the division followed in 1986. The Rail-Trail Council of Northeastern Pennsylvania, based in the old Cables Store at Union Dale, acquired the railbed and has rebuilt it in stages with federal and state grants. Ten miles from Vandling to Herrick Center came first, then the grade to Ararat, then Stevens Point to the state line. The Starrucca Creek bridge was restored for trail use in 2019 and 2020. Pennsylvania DCNR named the D and H its 2021 Trail of the Year.