RailTrailWx logoRailTrailWx
ForecastExploreLogbookProfilesAboutPricingUpdatesFAQPrivacyTermsYouTube

© 2026 Entrain Weather, LLC. RailTrailWxᵀᴹ and the Entrain Weather Microclimate Engineᵀᴹ are services of Entrain Weather, LLC.

Back to Trail Explorer

Paul Bunyan State Trail: Pine River

Paul Bunyan State Trail: Pine River, Cass, Crow Wing Counties, MN, 26.3 miles

Trail Facts

Hall of Fame
Inducted 2011 by Rails to Trails Conservancy
Length 26 mi
Elevation 1258 to 1388 ft
Grade 0.1% average
Shade cover 23%
Surface Asphalt

Activities

E-biking · Biking · Walking · Running · Hiking · Birding · Swimming · Snowmobiling · and more

About This Trail

The Pine River segment runs about 26 paved miles from Pequot Lakes north to Hackensack through Jenkins, Pine River, and Backus. This is the most open stretch of the Paul Bunyan State Trail: meadows, farm fields, and wetlands on a nearly straight rail grade. The trail crosses the Pine River on a bridge at the town of the same name, near a park, a dam, and a swimming beach, and Backus adds a beach on Pine Mountain Lake. Hackensack, with Lucette on the shore of Birch Lake, closes the segment. South of Pequot Lakes the Brainerd Lakes segment continues; north of Hackensack the Chippewa segment leaves the rail grade for the forest hills.

RailTrailWx TIPS

Paul Bunyan State Trail: Pine River

Your comfort. Prognosticated.

  • This is the sunniest segment of the whole trail. More than half the route is open ground with the trees set well back, so there is no shade to wait for on a hot summer afternoon; ride early or plan on the towns for breaks.
  • The corridor runs nearly dead straight from south-southeast to north-northwest with nothing to break the wind. A northwest wind is a headwind all the way to Hackensack and a tailwind coming back, and a south wind pushes you north.
  • The low point of the segment is the Pine River crossing. Early on a still morning the river and the mill pond above the dam hold the coolest, dampest air on the ride.
  • Hackensack sits about 100 feet higher than Pequot Lakes, but the rise is so gradual on the rail grade that you will not notice it. The real hills start north of Hackensack on the Chippewa segment.
  • On a hot day the swim stops are the point: a sand-bottom swimming area in Pine River near the trail and a beach in Backus on Pine Mountain Lake.
  • In winter the state opens the trail to snowmobiles, studded tracks included, so from first snow to spring the pavement belongs to sleds.

-Cory

Trivia

  • Pine River calls itself the birthplace of the Paul Bunyan Trail: in 1983 its Chamber of Commerce was the first community to pass a resolution asking the state to buy the whole rail line for a trail.
  • George Angus Barclay founded Pine River in 1873 with a trading post on the banks of the Pine River.
  • During the logging era thousands of board feet of timber were floated down the Pine River to lumber mills to the south.
  • Pine River was still receiving daily rail shipments of western lumber when the last train ran on August 15, 1985.
  • Pine River holds weekly duck races on summer Fridays.
  • Lucette Diana Kensack, Paul Bunyan's 17-foot bride on Birch Lake in Hackensack, was built by Doad Schroeder in 1951 and named through a contest won by an entrant from Cedar Rapids, Iowa.
  • Hackensack held its first Sweetheart Days festival on June 27, 1952, to celebrate the romance.
  • Gale-force winds blew Lucette's head and neck off on May 18, 1991; a fiberglass replacement from the F.A.S.T. Corporation of Sparta, Wisconsin, arrived on June 26, 1992.
  • Pequot Lakes was platted in March 1900 and got its name from a postal official who picked the first Indian-sounding name he could think of, that of a tribe in eastern Connecticut.

Climate

Excellent biking days per month, 2011-2025 climatology

In a typical year the Paul Bunyan State Trail: Pine River has about 86 to 133 days of excellent weather for popular activities such as hiking, dog walking, e-biking, running, biking, walking, and birding, with May, June, and September the best months.

RailTrailWx Comfort Scores, for your activity.

Hourly comfort scores for the next 15 days of weather, tuned to your activity and your own thresholds.

Plan your visit to this trail. Get the best windows for a comfortable outing.

View the forecast

Enjoy the Paul Bunyan State Trail: Pine River!

Peak Fall Color Climatology

Calendar of the typical peak fall color window along this trail

In half of past years, color along the Paul Bunyan State Trail: Pine River peaks September 30 to October 9, typically around October 4. The trail has 27% deciduous coverage, with the majority being quaking aspen, northern red oak, and bur oak.

History

The Brainerd and Northern Minnesota Railway laid this line north out of Brainerd in 1893 to reach the pine forests around Leech Lake. Red River oxcarts had already worn the Woods Trail past the village of Crow Wing at the south end, and George Barclay's 1873 trading post on the Pine River marked the way north. The rails reached Bemidji in December 1898. In 1900 the Northern Pacific folded the line into its new Minnesota and International Railway, a through route to International Falls. Logs and lumber were the first cargo, and Pine River still took daily carloads of western lumber in the line's last years. The Northern Pacific became part of Burlington Northern in 1970. In 1983 Burlington Northern decided to vacate the line, and the Pine River Chamber of Commerce asked the state to buy the whole corridor for a trail. The last train ran on August 15, 1985. The Legislature authorized the Paul Bunyan State Trail in 1988, and the first 50 miles from Brainerd to Hackensack opened in October 1992. The trail has since more than doubled in length, reaching Lake Bemidji State Park, and a six-mile extension reached Crow Wing State Park in 2012. The Rails-to-Trails Conservancy inducted it into its Hall of Fame in 2011. This segment is the trail's birthplace: Pine River's chamber passed the first resolution for the trail, and Hackensack was the north end of the 50 miles that opened in 1992.

Trailheads

  • Pequot LakesMILE 0Directions
  • JenkinsMILE 3.4Directions
  • Pine RiverMILE 9.2Directions
  • BackusMILE 18.3Directions
  • HackensackMILE 26.3Directions

Connects To

None

Managed By

Minnesota DNR

Further Reading

  • Midwest Weekends · Bicycling the Paul Bunyan Trail in northern Minnesota
  • Paul Bunyan Trail Association · Paul Bunyan Trail History
  • City of Pine River · Paul Bunyan Trail
  • Paul Bunyan Scenic Byway · Pine River: Day Trip
  • Whitefish Area Lodging Association · Our Communities
  • West Central Tribune · Think you know Paul Bunyan? Only if you know his wife
  • Wikipedia · Pequot Lakes, Minnesota
  • Explore Minnesota · Paul Bunyan State Trail
  • Abandoned Rails · The Brainerd and Northern Minnesota Railway
  • Wikipedia · Minnesota and International Railway
  • Wikipedia · Paul Bunyan State Trail
  • Minnesota Trails · Minnesota's Paul Bunyan State Trail
  • Minnesota Trails · Minnesota's Crow Wing State Park
  • Minnesota DNR · Heartland and Paul Bunyan State Trails map (Hackensack to Lake Bemidji State Park)

Nearby trails

Paul Bunyan State Trail: Chippewa

Rails to Trails Conservancy Hall of Fame
23 mi·MN
ExploreForecast

Paul Bunyan State Trail: Brainerd Lakes

Rails to Trails Conservancy Hall of Fame
33 mi·MN
ExploreForecast

Paul Bunyan State Trail: Bemidji

Rails to Trails Conservancy Hall of Fame
38 mi·MN
ExploreForecast